What if you could destroy contamination where it lies — for up to 75% less than trucking it to a landfill? Field-proven BioLogix technology. No hauling. No transferred liability.


"Delta successfully treated a legacy site in situ where the previous remediation contractor had failed. BioLogix is definitely different than other Bio products out there."
Brandon Smith
President, Clear Site Solutions
"We have been working with Delta to add expertise in our most challenging environmental programs. Working alongside Delta and their technology has added massive value to our business."
Joe Johnson
Owner, JPS Construction
80%+
of our clients become repeat customers.
Your T&D quote just came in and it's 30% higher than last year — again
You have 12 contaminated sites and budget for 3
The regulator wants a remediation timeline and you don't have one yet
Rain is in the forecast and you know how slick the roads in NEBC get... one of these trucks is going for a ride and now we have 2 sites to handle.
You have contaminated groundwater in your excavation site, and no remediation plan in place
The Dig-and-Dump Default is costing you more than you think. There's a better way.
BioLogix doesn't relocate contamination — it destroys it at the molecular level.
University-validated, field-proven, verifiable science — backed by 4 research partnerships and $500K+ in funded research.
We don't sell dormant bugs in a jug. We manufacture trillions of live bacteria on your site with our Re2Growth bioreactor — fresh, active cultures custom-grown for your contaminants.
This is the critical difference between Delta and every other bioremediation company. Off-the-shelf products ship dormant organisms that may never activate in field conditions. Re2Growth produces verified-active cultures on demand. At scale.
Before a single drop goes into the ground, we verify bacterial populations in real-time with fluorescence spectroscopy. No guesswork — just data.
Most bioremediation vendors can't tell you if their product is alive when it leaves the bottle. We verify activity at every stage of deployment.
University of Alberta
$500K funded bioremediation research program
University of British Columbia
Phytoremediation Research Partnership
University of Calgary
Sulfolane Research Partnership
Olds College
Research partnership
NRC Research Grants
Cold Climate Remediation Research
International Oilsands Tailings Conference
Publisher and Presenter
We review your site conditions, contamination profile, and existing data. Within days, you'll know if on-site treatment is viable.
We develop a custom treatment plan with BioLogix formulations optimized for your specific contamination type and soil conditions.
Our team provides high-performance on-site treatment and all required technical documentation to support your regulatory closure process. This enables you to achieve verified, regulator-approved closure with zero residual liability.
Most projects complete in 30–90 days. The Toxic Landfill legacy will live on for hundreds of years.
| Phase | Typical Duration |
|---|---|
| Site Assessment | 1–2 weeks |
| Treatment Plan Development | 1–2 weeks |
| Active Treatment | 1–4 weeks |
| Sampling & Verification | 3–4 months post-treatment |
| Regulatory Closure | 2–4 months |
Timeline Comparison: Conventional vs. BioLogix On-Site
Surface water treatments, like the example above, are typically faster and easier to complete than soil treatments.
Quality Certified
Safety Certified
Approved
Safety Incidents
R&D Partnerships
Research Grants
Network Member
Australian Approved
QA/QC Manufacturing
Field Deployments
You've heard of bioremediation. You might have even seen it fail. Here's how Delta is different.
You're right to be skeptical. If you've seen bioremediation fail, it probably did — because the vendor used off-the-shelf bacteria without understanding field application. That's not an unreasonable conclusion.
But consider this: 99.99% crude oil degradation in 19 days. That's not a lab result — that's a field result from a 5,000+ liter crude oil spill in Southern Alberta. Delta's BioLogix is university-developed, vertically integrated, with 90%+ removal rates across hundreds of field deployments. Past bioremediation failed because the vendor didn't close the feedback loop from field back to R&D. Delta does.
Many bio technologies look great in the lab and fail in the field. That's been the industry's biggest problem.
But consider this: Delta has deployed BioLogix across Canada, Kenya, Kuwait, Australia, and the Arctic — not lab studies. Including 36,000 m³ at a marine port facility and 1,400 m³ in the Arctic at an operating mine site in NWT. The products are DSL listed and federally approved — government regulatory approval, not just internal testing. ISO 9001 certified operations with a zero-incident safety record.
Regulatory deadlines are real. If you're worried about timeline, that's the right thing to worry about.
But consider this: What actually slows conventional projects is securing trucks, scheduling landfill, weather delays, and scope creep from deeper contamination. Delta's on-site treatment skips all of that. Southern Alberta lagoon: 19 days. Pipeline release: 45 days to full regulatory closure. A mining client in NWT: 6 days on-site. Plan ahead and meet regulatory requirements in the same season.
Rob Lacey
Founder & CEO
Delta Remediation
"Actually remediating your site doesn't have to cost more than landfill."
"Remediation is a contact sport — How you complete the treatment is equally as important to the technology of choice, be it chemical or biological."
"Soil that can be treated should be treated."
We specialize in post-emergency residual contamination. Active spills need containment first — then we step in.
BioLogix is optimized for TPH, BTEX, and PAHs. Heavy metals and non-organic contaminants require different treatment approaches.
Our contaminated lagoon result is a documented best case. Most projects take 90-120 days — timelines are site-dependent.
If you have a small volume near a disposal facility, dig-and-dump may be comparable. We'll tell you honestly if that's the case.
Our goal is to first ensure your site is actually a good candidate for BioLogix. If it is we can improve your sustainability goals while maximizing your rem budget, and if your site isn't a good candidate we'll tell you.
We guarantee our cost will never exceed what you'd pay for an all-in trucking and disposal option.
Your worst case is that you eliminated your long-term liability while increasing your firm's sustainability. Your best case is up to 75% savings.
We can't guarantee every site but we are dedicated to changing the narrative on soil disposal in Canada and we're willing to put our money where our mouth is. See if your site qualifies for our guaranteed approach.
A 30-minute call with a Delta remediation specialist. Here's what you'll get:
We'll review your site conditions and contamination profile to understand the scope.
We'll confirm whether on-site treatment is viable for your specific situation.
High-level estimate compared to dig-and-dump alternative.
If BioLogix isn't the best available technology for your site, we will tell you what is and where to find it.
No cost. No obligation. Just clarity on your options.
This is the kind of analysis you'd normally engage an environmental consultant for — we provide it free because it helps us both determine if there's a fit.
Delta Remediation provides on-site soil remediation services across all Canadian provinces, with particular expertise in Western Canada's oil and gas sector.
Primary service region
Full coverage
Full coverage
Full coverage
Local Partner Established
Local Partner Established
Available
Available
Delta's Field Team
Get the analysis you'd normally engage an environmental consultant for — at no cost, because it helps us both determine if there's a fit.
Includes: site evaluation, technology fit assessment, ballpark cost estimates, remediation options analysis.
30 minutes. No cost. No obligation.