Destroy contaminants where they are. Save up to 75% vs. dig-and-dump. Meet sustainability mandates with permanent, on-site treatment.
Tell us about your site โ a remediation specialist will respond within one business day.
Dig-and-dump has been the default for decades โ but it's the most expensive, highest-carbon, and least permanent option available.
Trucking, landfill tipping fees, and backfill. A single dig-and-dump project routinely runs 2โ4ร the cost of on-site treatment.
When you haul contaminated soil to a landfill, the liability follows it โ and follows you. The contamination isn't destroyed. It's relocated.
Hundreds of truck trips, diesel emissions, and landfill methane. Dig-and-dump creates a second environmental problem while solving the first.
| BioLogix On-Site Treatment | Dig & Dump Trucking & Disposal | |
|---|---|---|
| Cost | Up to 75% less | Baseline (highest option) |
| Carbon Footprint | ~90% lower | Hundreds of truck trips + landfill |
| Liability | Destroyed on-site โ closed permanently | Transferred to landfill โ follows you |
| Timeline | Comparable โ weeks to months | Weeks to months |
| Compliance | Full regulatory acceptance | Accepted โ but liability persists |
We review your site data, contamination profile, and regulatory requirements. No cost, no obligation โ just a clear picture of your options.
Our team designs a BioLogix protocol matched to your specific contaminants, soil conditions, and compliance targets. You get a detailed scope and cost estimate.
We deploy to your site and destroy contaminants in place. No trucks. No landfill. You receive verified lab results and regulatory documentation for closure.
Degradation
Timeline
Legacy crude oil lagoon treated on-site with BioLogix. Lab-verified 99.99% hydrocarbon degradation in 19 days โ no trucking, no hauling.
Destruction Rate
Cost Savings
Active industrial facility treated without operational disruption. 94% contaminant destruction at 60% of the projected dig-and-dump cost.
To Closure
Reg. Approval
Pipeline release site remediated on-site and received full regulatory closure in 45 days. Contaminants destroyed, liability permanently closed.
Quality Certified
Safety Certified
Approved
Safety Incidents
R&D Partnership
Network Member
We guarantee our cost will never exceed what you'd pay for trucking and disposal.
Your worst case is the same as the default. Your best case is up to 75% savings.
Get a free site assessment โ we'll tell you if BioLogix is right for your site.